Call our team for a personal consultation regarding your businesses fire and security needs on 01733 246 990
5-Star Access Control Maintenance Contractor
A failed lock either leaves a door open to anyone or stops it opening when it should. Britannia’s access control system maintenance checks the parts that fail quietly, from readers and locks to power supplies, batteries and emergency overrides, before they let you down.
Most access control faults build slowly. A battery loses capacity, a reader starts missing fobs, a lock stops holding. Then one day a door won’t secure, or won’t release. Each maintenance visit covers:
You get a full preventative maintenance report after every visit, including any repairs needed. Between visits, 24/7 emergency call-outs keep doors working.
If an access-controlled door is on an escape route, it’s part of the building’s fire precautions. In England and Wales, the Regulatory Reform (Fire Safety) Order 2005 requires fire safety facilities, equipment and devices to be kept in efficient working order and good repair. That includes the locks on escape doors.
Approved Document B (England) says electrically powered locks on escape routes should unlock on fire alarm, on power failure or system error, and when the override is used. BS 7273-4:2015+A2:2023, which covers that release interface, recommends weekly release testing through the fire alarm and an annual check of manual release units.
NSI’s access control code of practice, NCP 109 Issue 3, set a preventive maintenance visit every 12 months for NSI-approved companies. Issue 4, mandatory since 30 September 2025, makes parts of BS 7273-4 mandatory.
Then there’s the data. Access logs and credentials are personal data under UK GDPR, and biometric templates are special category data. Keeping user permissions current, and removing leavers, is part of running a compliant system.
Tell us what’s installed and roughly how many doors. An engineer surveys the system, and we quote an access control maintenance contract that spells out visit frequency, the parts maintained, emergency call-out costs, emergency contacts and exclusions. No obligation.
Call 01733 246 990 or email info@britanniaalarms.co.uk.
We maintain access control across the UK from our base in Peterborough, with engineers covering Cambridge, Northampton, Leicester, Nottingham, Lincoln and Luton.
Our maintenance contracts cover offices and commercial premises, industrial sites, healthcare premises, schools, local authority buildings, retail and leisure, and we work with electrical contractors as a maintenance partner after handover.
Access control is a primary element of data security that decides who is authorised to access and use certain company information. Access control policies, through authentication, ensures that users are who they claim to be, and that they are correctly authorised to access company data.
Maintaining an access control system begins with a visual inspection, ensuring that everything appears to be in order. Cleaning components and checking power functionality is an important second step. Thirdly, you will need to ensure that the access control software is up to date. Finally, it is imperative that a professional is inspecting your access control system at least once a year.
In the event of a breakdown, our team is available to provide emergency repairs and get your system up and running again. However, regular maintenance can help prevent unexpected breakdowns from occurring.
While it may seem cost-effective to DIY your access control system maintenance, it’s not recommended. Our trained professionals have the knowledge and expertise to properly maintain your system and identify potential issues that an untrained individual may overlook.
Our office will close at Midday on Wednesday 24th December 2025 and will reopen at 9am on Monday 5th January 2026. During the festive shutdown peri...
🌍We're pleased to announce that we've now been recording our data for two years.
Our office will close at 12:00 on Tuesday the 24th of December 2024 and will reopen at 09:00 on Thursday the 2nd of January 2025. During the festive s...